top of page

Impacted by WAIRE?
Deploy EV Charging Infrastructure in Weeks.

California’s WAIRE regulation requires warehouses over 100,000 sq ft to reduce emissions or pay up to $1,000 per point in mitigation fees. Traditional EV charging takes 12-24 months to install. You don't have that kind of time. OptiGrid’s Reservoir deploys in weeks using your existing power. No site upgrades or long utility wait.

vB_image_v2_square1.png

Understanding WAIRE

The Warehouse Actions and Investments to Reduce Emissions (WAIRE) program requires large warehouses in Southern California to earn points by reducing truck emissions. 

Who Must Comply

Warehouses with 100,000+ sq ft in the South Coast AQMD (Orange County, parts of LA, San Bernardino, and Riverside counties).

How Points Work

Your required points are based on annual truck trips. Earn points through zero-emission vehicles, charging infrastructure, and solar installation.

Cost of Non-Compliance

Fall short on points? Pay $1,000 per point in mitigation fees. SCAQMD has already collected $50M+ in these fees.

How you can save money through earning points

Examples of ways Reservoir can help you avoid WAIRE related penalties

Action

WAIRE Points

Equivalent Fee Avoided

Install Reservoir Battery-Integrated DCFC

118 points

$118,000

Energize DCFC

59 Points

$59,000

Begin EVSE construction

9 Points

$9,000

Total per Reservoir Charger

186 Points

$186,000 fees avoided

Traditional EV charging infrastructure won’t get your site compliant on time.

Installing conventional DC fast charging at your warehouse typically requires utility upgrades, permits, and construction that takes 12-24 months. With the WAIRE deadline approaching, that timeline puts your compliance at risk. Reservoir uses battery-integrated technology that works with your existing site power, getting your site operational in weeks instead of years.

Traditional DCFC

12-24 months typical deployment

  • Can require grid upgrades and lengthy construction timelines

  • High demand charges

  • Permanent installation

  • Heavy upfront CapEx

OptiGrid’s Reservoir

4-6 weeks typical deployment

  • Battery buffers the grid, so no major upgrades needed

  • Charges off-peak, smooths demand spikes

  • Relocatable due to small footprint and flexible design

f_render03_logo_adj.png

How Resevoir Can Get You Compliant Faster

Reservoir uses onboard battery storage to deliver DC fast charging without grid upgrades, getting you from contract to earning points in weeks, helping you get to WAIRE compliance more quickly so that you can stop paying fees.

Works With Existing Power:

Onboard battery storage lets us deliver DC fast charging to your site without requiring utility upgrades or new service installations.

4-6 Week Deployment:

Skip the 12-24 month utility timeline. Our turnkey solution gets you charging and earning WAIRE points quickly.

Lower Operating Costs:

Battery integration reduces demand charges and avoids expensive peak energy pricing, cutting your ongoing costs.

Grant Eligible:

Qualifies for California incentive programs and upcoming SCAQMD grants.

3

Installation

Equipment delivery and installation with minimal operational disruption.

4

Deployment

Reservoir units go live. Start charging vehicles while earning WAIRE points.

2

Planning

Custom solution design that fits your site needs, plus grant identification.

1

Assessment

We evaluate your site, power availability, and WAIRE point requirements.

Your Path to Compliance

Talk to our team of experts today

Get a free site assessment and learn how OptiGrid can have you compliant in weeks.

Country
bottom of page