top of page

Energy Management

Control when and how your fleet charges with scheduled charging capabilities. Set charging times to take advantage of off-peak rates and ensure vehicles are ready when needed.

Charger Analytics

Monitor your entire charging network from a single dashboard. Track energy usage, charging patterns, and vehicle readiness across all locations. Identify trends and generate reports to optimize fleet performance.

Remote Monitoring

Monitor charger status in real time and diagnose issues remotely. Configure settings and manage driver access from anywhere to keep your charging infrastructure running smoothly.

Platform Integrations

Connect with your existing fleet management and telematics systems with our OCPP compliant solutions. Seamless compatibility ensures your charging infrastructure works with the tools you already use.

Manage Your Entire Charging Network from Anywhere

OptiGrid's Energy Management Platform enables remote monitoring, diagnostics, and over-the-air updates keep chargers running at peak performance with minimal downtime.

EV Fleet Charging Solutions That Eliminate Grid Bottlenecks

Stop waiting years for utility upgrades. We deliver battery-integrated EV fleet charging solutions tailored to your depot’s schedule, ensuring your vehicles are powered and ready without the construction headaches.

DC Fast Charging for EV Fleets

Traditional DC Fast Charging Solutions

Complex infrastructure project with multiple components and a 12-24 month completion time

Energy
Storage

EV Charging Battery Storage

Battery

EV Charging Inverter

Inverter

Charging Infrastructure

EV Charging Dispenser

Dispenser

Power Cabinet for EV Charging

Power Cabinet

Grid
Infrastructure

Switchgear for EV Charging

Switchgear

Grid Transformer for EV Charging

Transformer

OptiGrid DC Fast Charger

Fully integrated turnkey solution deployed in 4-6 weeks

OptiGrid DC Fast Charger for EV Fleets

Traditional DC Fast Charging Solutions

Typical installations require coordinating complex, multi-part infrastructure with a lead time of twelve to twenty four months.

Charging Infrastructure

EV Charging Dispenser

Dispenser

Power Cabinet for EV Charging

Power Cabinet

Energy Storage
 

EV Charger Inverter

Inverter

EV Charging Battery Storage

Battery

Grid Infrastructure

Grid Transformer for EV Charging

Transformer

Switchgear for EV Charging

Switchgear

OptiGrid DC Fast Charger

Bypass the long lead times associated with traditional heavy infrastructure. Our complete, all-in-one solution is designed for rapid deployment so you can start charging in just four to six weeks.

OptiGrid DC Fast Charger for EV Fleets

BABA compliant and manufactured in the USA, ensuring quality standards.

Why Leading Fleets Switch to Our EV Fleet Charging Solution

Rapid Deployment Timeline

Time is your most valuable asset. While competitors wait 12-24 months for permits and transformers, our system is designed to go live in weeks. It is the only EV fleet charging solution that works with your existing on-site power, bypassing the need for massive grid upgrades.

Minimize Operational Expenses

Traditional chargers spike your utility bill with demand charges. Our unique EV fleet charging solution utilizes integrated batteries to buffer the grid, allowing you to charge at high speeds while drawing low power. This helps you permanently avoid peak energy pricing.

Future-Proof Scalability

Start with what you need today and expand tomorrow. Our modular design allows you to add units incrementally as your EV fleet grows. If your depot moves, our infrastructure moves with you. This offers a level of flexibility not found in standard EV fleet charging solutions.

Hardware Built for EV Fleet Charging

Product Features

EV Chargers Built for Fleet Operations

Flexible Interface 

Customize the hardware to fit your operational requirements. We give you the choice between a standard display interface and a minimalist, screen-free version.

All In One Design 

Get a turnkey EV fleet charging and storage solution from a single source. We handle the integration, so you never have to waste time coordinating with multiple vendors.

Compact Footprint

Deploy high-capacity charging in space-restricted depots and challenging job sites with a compact, efficient footprint.

Adaptive Infrastructure

Low-impact installation allows for low-cost relocation. Easily adjust your charging layout or move sites completely without draining your budget.

Grid Resilience

Bypass grid constraints to keep your vehicles moving. Our solution draws on stored battery power during utility slowdowns to prevent any interruptions to your charging cycle.

Dual Port

Maximize your operational readiness with intelligent dual charging. The system splits power in 1 kW increments to match each vehicle's exact needs, allowing you to charge two vehicles simultaneously with maximum efficiency.

Actionable Status Lighting 

Accelerate your charging workflow by giving drivers instant insight into station status. This clarity allows them to make faster decisions about where to plug in so the fleet never stops moving.

Remote Monitoring & Control

Manage your fleet remotely with real-time performance data. Monitor energy consumption and session details from anywhere to quickly diagnose faults and keep your operations optimized.

EV fleet charging solutions that adapts to your operations

Let your operations dictate the infrastructure. We configure our chargers to align perfectly with your depot's layout and daily logistics.

Screen

Configure the hardware strictly for your application. You can choose to integrate full display and payment capabilities or opt for a streamlined unit that omits them entirely.

Cable Length

Match cable lengths to your fleet’s specific parking configuration to ensure easy reach while eliminating clutter and safety hazards.

Branding

Extend your brand presence right into the depot. We allow you to apply your corporate colors and logo to the hardware so every charging point reflects your company identity.

Green Branded OptiGrid EV Fleet Charger
Black Branded OptiGrid EV Fleet Charger
Blue Branded OptiGrid EV Fleet Charger

Energy Management

Slash energy costs by automating charge sessions during off-peak hours, ensuring your fleet is powered up and ready for deployment at the lowest possible rate.

Charger Analytics

Centralize your operations with a unified dashboard that provides real-time visibility into every charger across your network. Track energy consumption and vehicle readiness to maintain peak uptime across all locations.

Remote Monitoring

Maximize uptime with real-time status monitoring and remote troubleshooting capabilities. Diagnose and resolve issues instantly without a site visit, ensuring your fleet remains powered and ready.

Platform Integrations

Unify your operations by integrating charging data directly into your existing fleet management and telematics platforms. Our fully OCPP-compliant architecture ensures plug-and-play compatibility with the software stack you rely on today.

Oversee your entire infrastructure through a single interface

OptiGrid allows you to monitor performance, run diagnostics, and push system updates remotely so you can maintain optimal fleet readiness without physical site visits.

Ready to Deploy
 Battery-Integrated DC 
Fast Charging?

Talk to our team of electrification experts about bringing OptiGrid to your fleet operation.

Country

Specifications

Footprint

43" x 40" x 99"

Charge Connectors

CCS1

Battery Capacity

180 kWh

Output Power

200 kW

Input Power

5-66 kW

Innovation backed by experience

Now in its fourth generation, OptiGrid’s DC fast charging system reflects nearly a decade of engineering refinement. With proven deployments underway and growing commitments from fleet operators, OptiGrid’s ultra-fast charging solution is built to deliver reliability, performance, and scalability from day one.

A story of industry-leading R&D

2014-2018

Established
mobile charing platform

2019

AMP development begins

2020

DC Fast Charging platform development

2021

DC to DC converter released

2022

1st Gen charger released

2022

AMP released

2023

2nd Gen charger released

2024

3rd Gen charger released

2025

Established
mobile charing platform

2026 and Beyond

Could get into short and longer term. A little roadmappy light?

All-in-One Fast Charging

Traditional DC Fast Charging Solutions

Complex infrastructure project with 12-24 month completion time


Energy Storage

Battery

Inverter

Charging Infrastructure

Dispenser

Power Cabinet


Grid Infrastructure

Switchgear

Transformer

The Orange Juicer™, Powered by OptiGrid

Orange EV trucks are helping fleets cut diesel costs and reduce emissions, but the transition to electric requires charging infrastructure that can scale without years of waiting or expensive grid upgrades. That's where the Orange Juicer™ comes in.


Built on OptiGrid's battery-integrated technology, the Orange Juicer™ deploys in weeks, not years, giving Orange EV customers the charging capacity they need without utility delays. We handle the engineering complexity. Orange EV delivers complete electrification solutions to their fleets.

“As more customers accelerate adoption of Orange EV trucks and electrify other site equipment, we’ve seen infrastructure upgrades cause serious holdups. The Orange Juicer solves that challenge, giving fleets a fast, scalable, and cost-effective charging platform that utilizes existing on-site power.”

Kurt Neutgens, co-founder and president of Orange EV

Frequently Asked Questions

  • Most deployments go live in 4 to 6 weeks from order to first charge. Traditional DC fast charging infrastructure typically requires 12 to 24 months due to utility coordination, transformer upgrades, switchgear installation, and permitting delays.

    OptiGrid's battery-integrated design works with your existing on-site power, eliminating the need for heavy grid upgrades and dramatically compressing the installation timeline. A site assessment and electrical review are conducted upfront to confirm compatibility before deployment begins.

  • Yes. This is one of the key advantages of OptiGrid's modular, battery-integrated design. Unlike traditional charging infrastructure that involves permanent grid connections, transformer pads, and switchgear enclosures, OptiGrid units can be relocated when your depot changes.

    The low-impact installation approach means units can be uninstalled, transported, and redeployed at a new site without incurring the full capital cost of a new installation. This flexibility is particularly valuable for fleet operators with multi-site operations or those working out of leased facilities.

  • OptiGrid addresses two of the biggest cost drivers in fleet charging: demand charges and infrastructure capital costs.

    Traditional DC fast chargers draw large amounts of power simultaneously, triggering utility demand charges that can account for 30 to 70 percent of a fleet's monthly electricity bill. OptiGrid's integrated 180 kWh battery buffers these peak draws, allowing vehicles to charge at up to 200 kW while the system draws only 5 to 66 kW from the grid. This keeps demand charges consistently low.

    On the infrastructure side, bypassing transformer and switchgear upgrades eliminates costs that can reach hundreds of thousands of dollars per depot site.

  • Traditional DC fast charging depot buildouts are capital-intensive. A standard installation involving utility upgrades, a new transformer, switchgear, a power cabinet, a dispenser, and civil works can range from $150,000 to $500,000 or more per depot, depending on the size of the grid upgrade required and local utility lead times.

    OptiGrid eliminates the grid infrastructure portion of that cost entirely. The system runs on existing on-site power with an integrated battery, which substantially reduces the overall cost of ownership. The avoided demand charges also provide ongoing operational savings throughout the life of the installation. Contact our team for a site-specific cost comparison.

  • The OptiGrid DC fast charger ships with the following specifications:
     

    • Output power: 200 kW

    • Input power: 5 to 66 kW (works with existing on-site power)

    • Battery capacity: 180 kWh integrated

    • Charge connectors: CCS1

    • Footprint: 43" × 40" × 99"

    • Ports: Dual port, splitting power in 1 kW increments to charge two vehicles simultaneously
       

    The system is BABA-compliant and manufactured in the USA.

  • OptiGrid's energy management platform allows fleet managers to schedule charging sessions during off-peak utility hours when electricity rates are at their lowest. The system can be configured to automatically charge the integrated battery bank during low-rate windows overnight and then dispatch that stored energy to vehicles during peak operational hours.

    This time-of-use optimization, combined with demand charge buffering, means fleets can charge vehicles at full speed during their operational window without paying peak energy prices or triggering high demand charge events.

  • Yes. OptiGrid's charging platform is fully OCPP-compliant, which means it integrates with the majority of fleet management, telematics, and energy management platforms already in use by commercial fleet operators.

    OCPP (Open Charge Point Protocol) is the industry standard for EV charging communication. It enables plug-and-play compatibility with software stacks including fleet dispatch systems, driver access management tools, and energy monitoring dashboards without requiring any custom development work.

  • OptiGrid's DC fast charger uses CCS1 connectors, which is the North American standard for commercial electric vehicles including electric yard trucks, last-mile delivery vans, medium-duty work trucks, and electric terminal tractors such as those made by Orange EV.

    The dual-port design supports two vehicles simultaneously with intelligent power splitting in 1 kW increments, so each vehicle receives exactly the power it needs. If your fleet includes vehicles with different state-of-charge requirements, the system adapts automatically without any manual configuration.

All-in-One Fast Charging

Grid
Infrastructure

Switchgear

Transformer

Charging Infrastructure

Dispenser

Power Cabinet


Energy Storage

Battery

Inverter

Traditional DC Fast Charging Solutions

Complex infrastructure project with 12-24 month completion time

OptiGrid DC Fast Charger

Fully integrated turnkey solution deployed in 4-6 weeks

bottom of page