Built for How Depots Actually Operate
Operational In Weeks
Time lost waiting for grid upgrades is time your competitors are gaining. OptiGrid fleet depot charging infrastructure is designed for rapid deployment — most sites go live in 4–6 weeks, giving you a charging operation that matches the pace of your fleet growth.
No Grid Upgrades
Traditional depot charging requires transformer upgrades, switchgear, and utility coordination that can take 12–24 months. OptiGrid's battery-integrated design runs on 5–66 kW of existing on-site power and delivers 200 kW to your vehicles — no infrastructure overhaul required.
Scales With Your Fleet
Don't over-invest upfront. OptiGrid's modular design lets you add charging capacity incrementally as your depot electrifies more vehicles. And if your depot relocates, the infrastructure moves with you — a critical advantage for leased facilities.
BABA compliant and manufactured in the USA, ensuring quality standards.
EV fleet charging solutions that adapts to your operations
Let your operations dictate the infrastructure. We configure our EV fleet chargers to align perfectly with your depot's layout and daily logistics.
Screen
Configure the hardware strictly for your application. You can choose to integrate full display and payment capabilities or opt for a streamlined unit that omits them entirely.
Cable Length
Match cable lengths to your fleet’s specific parking configuration to ensure easy reach while eliminating clutter and safety hazards.
Branding
Extend your brand presence right into the depot. We allow you to apply your corporate colors and logo to the hardware so every charging point reflects your company identity.



The Real Barriers to Fleet Depot Electrification
Fleet depot operators face a unique set of charging challenges that standard EV infrastructure wasn't designed to solve. OptiGrid was built specifically to address them.
Product Features

Power-Constrained Sites
Many fleet depots — warehouses, distribution centers, port facilities — operate on limited electrical service that can't support traditional DC fast chargers without major upgrades. OptiGrid's onboard 180 kWh battery buffers demand, making high-speed charging possible on circuits that standard chargers would overload.
Tight Depot Layouts
Depot space is valuable. OptiGrid's compact 43" × 40" footprint fits into constrained yard layouts and tight charging corridors without sacrificing charging capacity. The dual-port design charges two vehicles simultaneously from a single unit, maximizing throughput per square foot.
Demand Charge Exposure
Charging multiple vehicles simultaneously creates demand spikes that drive up monthly utility bills. OptiGrid's intelligent energy management dispatches stored battery power during high-demand windows, keeping your demand charges low regardless of how many vehicles are charging.
Multi-Shift Operations
Depots that run 24/7 can't afford charging downtime. OptiGrid's onboard battery charges during off-peak hours and dispatches power on demand, ensuring vehicles are ready at shift change regardless of grid conditions or utility rate windows.
Energy Management
Schedule charging windows to align with off-peak utility rates. Automate charge cycles so every vehicle is fully powered before the next shift begins.
Charger Analytics
Track energy consumption, charging patterns, and vehicle readiness across your depot network. Generate reports to identify inefficiencies and optimize fleet performance.
Remote Diagnostics
Identify and resolve charger issues without dispatching a technician. Over-the-air updates keep every unit running at peak performance with minimal downtime.
Platform Integrations
OCPP-compliant architecture ensures seamless integration with the fleet management and telematics platforms your depot already uses.
Manage Your Entire Depot Charging Network from Anywhere
OptiGrid's Asset Management Platform gives depot managers full visibility and control over every charging unit across every location without a site visit.

Ready to Build Out Your Fleet Depot Charging Infrastructure?
Traditional Depot Charging Infrastructure
Requires utility coordination, transformer upgrades, switchgear, power cabinets, and dispensers — a complex multi-vendor project with a 12–24 month completion timeline and significant civil works costs.
Charging Infrastructure

Dispenser

Power Cabinet
Energy Storage

Inverter

Battery
Grid Infrastructure

Transformer

Switchgear
OptiGrid Fleet Depot Charging
Many fleet depots — warehouses, distribution centers, port facilities — operate on limited electrical service that can't support traditional DC fast chargers without major upgrades. OptiGrid's onboard 180 kWh battery buffers demand, making high-speed charging possible on circuits that standard chargers would overload.

Fleet Depot Charging Infrastructure Without the Wait
Most fleet depots are ready to electrify. The grid isn't. OptiGrid solves that problem with battery-integrated DC fast charging infrastructure that works with your existing on-site power — no transformer upgrades, no utility delays, no construction projects. Just charging, operational in weeks.
