top of page
The Next Wave of EV Charging Infrastructure

OptiGrid’s fully-integrated, ultrafast, modular charging solution packages charging infrastructure, grid infrastructure, and energy storage into an integrated battery system that unlocks an entirely new category of distributed energy services.

We’ve solved the biggest problems facing ultrafast charging.

FAST

Quickly address power needs, becoming operational and charging vehicles in a matter of weeks…not years. 

Don’t wait for the utility to upgrade power. Use available power on site to avoid time-consuming construction projects.

 

LOW-COST

Installation is inexpensive and simple, using existing power available at site. No grid upgrades or extensive site upgrades are required.

Our solution is significantly less costly to operate. Fuel fleet vehicles for less by lowering peak demand charges and avoiding peak energy prices. 
 

FLEXIBLE

Grow charging infrastructure as needed, incrementally, with growth of vehicle fleet and avoid massive CapEx investments.

Easily relocate infrastructure. Change location and layout of charging infrastructure with minimal cost thanks to modular design, compact footprint, and low installation costs. 
 

next wave v2.3_2x.png

OptiGrid provides battery-buffered ultrafast charging: integrating battery storage, AC-to-DC conversion, power management and a fast charger in one self-contained unit.

OptiGrid

Turnkey solution in 4-6 weeks. Fully integrated and modular.

fenix_transBG_2x_edited.png
OptiGrid

Existing solutions

Multi-component, complex, large footprint and a 12-24 months completion time

bottom of page